Mold Rack — Heavy-Duty Drawer Storage for Injection & Stamping Dies
Purpose-built for plastic injection molds, die-casting molds, stamping dies and tooling. Roll-out drawer design pulls 1–8 ton molds fully clear of the rack for crane lifting — zero need to dismantle adjacent units. AME Rack manufactures EN 15512 / RMI MH16 compliant systems exported to 65+ countries.
Mold Rack — Roll-Out Drawer Storage Engineered for Heavy Tooling
Mold racks (also called mould racks, die storage racks or pull-out drawer racks) replace traditional pallet shelves with reinforced cantilever drawers that extend 100% out of the rack on industrial-grade rollers or telescopic rails. The mold is craned in or out at any level without disturbing adjacent drawers, eliminating the danger of stacked-mold collapse.
Standard in plastic injection molding plants, automotive stamping shops, die-casting foundries, rubber molding factories, and toolrooms — anywhere expensive precision tools (typically USD 5,000–500,000 each) need safe, fast, organised access.
Why Mold Racks Pay Back Within One Production Cycle
Eight engineering and operational advantages that explain why mold drawer racking is the standard storage system for injection molders, stamping shops and die-casting foundries worldwide.
Heavy Drawer Load
Single drawer rated 1,000–8,000 kg. Roller-bearing or telescopic rail system tested to 1.5× working load per EN 15512.
100% Pull-Out
Drawer extends fully clear of rack — overhead crane, jib crane or chain hoist lifts mold without dismantling rack frame.
Safety Lock
Drop-in safety pin locks drawer closed during forklift travel; spring lock prevents accidental drawer roll-out during seismic events.
Fast Tool Change
Cut average mold-change downtime by 40–60% vs floor stacking — operator locates and extracts mold in under 90 seconds.
No Stacking Damage
Each mold sits on its own drawer — eliminates the scratch, dent and corner-chip risk of traditional ground-stacking on wood pallets.
Modular Layout
Drawer pitch adjustable at 100 mm increments — mix 2 T and 5 T drawers in the same upright frame to match mold size variety.
Indoor or Tool Yard
Standard powder coat for indoor toolrooms; HDG 80–120 μm for outdoor / unheated tool yard storage.
ERP-Ready Labelling
Optional bar-code label holder + RFID slot on every drawer face — integrates with MES / ERP for real-time mold inventory tracking.
Three Mold Storage Configurations for Every Tooling Operation
From standard drawer-type mold racks to heavy-duty full-open systems and selective pallet racking adapted for mold storage — match drawer load, access method and footprint to your specific tooling profile.

Standard Mold Rack
1–2 T per drawer, telescopic rails, 3–5 level upright. The volume seller — fits 80% of plastic injection and small stamping operations with full drawer pull-out for crane lifting.

Heavy-Duty Full-Open Mold Rack
2–5 T per drawer, 100% full pull-out structural rails, reinforced upright. Engineered for large injection molds (>1,000 t machine) and automotive stamping dies requiring complete crane access from above.

Selective Rack for Mold Storage
Standard selective pallet racking adapted for mold storage — molds rest on reinforced pallets or steel cradles. Forklift-access, lowest cost-per-position, ideal for low-rotation mold archives and overflow inventory.
Engineered Technical Parameters — 3 Standard Configurations
Standard catalogue spec range across drawer-type and pallet-type mold storage. All parameters are fully customisable — send mold profile, max weight, access frequency and overhead crane capacity for project-specific engineering.
| Parameter | Standard Mold Rack | Heavy-Duty Full-Open | Selective Pallet Rack |
|---|---|---|---|
| ▎Load & Capacity | |||
| Storage Type | Roll-out drawer | 100% full pull-out drawer | Pallet / steel cradle on beams |
| Unit Load Capacity | 1,000 – 2,000 kg / drawer | 2,000 – 5,000 kg / drawer | 1,000 – 4,000 kg / pallet |
| Beam UDL (per pair) | — (drawer system) | — (drawer system) | 1,000 – 4,000 kg |
| Levels per Bay | 3 – 5 drawer levels | 2 – 3 drawer levels | 3 – 6 pallet beam levels |
| ▎Dimensions | |||
| Storage Unit Size (L×W) | 1200 × 1000 mm drawer | 1500 × 1200 – 1800 × 1400 mm drawer | 1100 × 1100 / 1200 × 1000 mm pallet |
| Upright Height | 2.5 – 3.5 m | 3.5 – 6.0 m | 4.0 – 12.0 m |
| Aisle Width Required | 1.6 – 2.0 m (crane access) | 2.0 – 2.5 m (crane access) | 2.8 – 3.6 m (forklift) |
| ▎Structure & Materials | |||
| Upright Profile | C 120 × 75 × 2.5 | Box 150 × 100 × 3.0 / 180 × 120 × 4.0 | Roll-formed Ω 90 – 140, 2.0 – 3.0 mm |
| Drawer Bed / Beam | 3 mm steel deck drawer | 4 – 6 mm steel deck drawer | Step beam 1.5 – 2.0 mm + wire mesh |
| Rail / Connector | Telescopic 3-section rail | Heavy industrial slide rail | Bolted / hooked beam connector |
| Steel Grade | Q235B / Q345B | Q345B (S355JR) | Q235B / Q345B |
| ▎Access & Safety | |||
| Mold Access Method | Drawer pull-out + overhead crane | Full extension + overhead crane | Reach / counterbalance forklift |
| Drawer Extension | 100% | 100% | — (pallet system) |
| Safety Lock | Drop-pin + spring | Twin-pin + seismic lock | Beam safety clip + column guard |
| Anchor Spec | M16 × 110 mm | M20 – M24 × 150 – 170 mm | M12 – M16 × 95 – 110 mm |
| ▎Finish & Compliance | |||
| Finish | Powder coat 80 μm | Powder coat 100 μm or HDG | Powder coat 60 – 80 μm |
| Compliance | EN 15512 / RMI MH16 | EN 15512 / AS 4084 / structural FEA | EN 15512 / AS 4084 / RMI MH16.1 |
| Seismic Zone | Zone 1 – 3 | Zone 1 – 4 + IBC | Zone 1 – 4 |
| Service Life | 15 years | 25 years | 20 years |
| ▎Commercial | |||
| Lead Time | 3 days | 20 days | 15 days |
| FOB Price (USD) | $ 520 – 780 / drawer | $ 1,800 – 2,600 / drawer | $ 95 – 180 / pallet position |
| Best For | Plastic injection & small stamping molds | Automotive dies, >1,000 t machine molds | Low-rotation mold archive & overflow storage |
Every Drawer, Rail and Lock — In-House Manufactured
Ten core components engineered, rolled, welded and coated under one roof at AME Rack's 15,500 m² Dongguan plant. Industrial telescopic rails sourced from certified bearing suppliers — never furniture-grade slides.
Upright Frame
Reinforced box-section upright (150×100×3 mm to 180×120×4 mm Q345B), welded baseplate, slotted at 100 mm pitch for drawer level adjustment.
Drawer Bed
2–6 mm steel deck plate fully welded to drawer side rails. Smooth surface with optional non-slip cleats to prevent mold shift during pull-out.
Telescopic Slide Rail
3-section heavy-duty telescopic rail (industrial-grade, NOT furniture grade) — chrome-steel ball bearings rated 1.5× working load per EN 15512.
Roller Bearing System
Light-duty alternative: hardened steel rollers running on box-section track. Lower cost, 95% extension instead of 100%, suits 1–2 T drawers.
Safety Drop Pin
Manual drop-pin locks drawer in the closed position — prevents accidental roll-out during seismic events or forklift impact on the rack frame.
Seismic Spring Lock
Spring-loaded latch auto-engages when drawer reaches closed position; release lever required to open. Mandatory in Zone 3–4 seismic projects.
Drawer Handle
Ergonomic D-handle on drawer face — full-grip steel handle with anti-pinch profile, sized for gloved hand.
Bar-Code / RFID Label
Optional label holder welded to drawer face — A5 paper label, bar-code window, RFID slot for ERP/MES integration.
Column Protector
Yellow HDPE + steel hybrid guard at every aisle-side upright base, 400 mm tall. Mandatory in forklift-active toolrooms.
Load Capacity Sign
Aluminium sign at the top of each rack — drawer number, max load per drawer, max total load per upright frame. Mandatory under OSHA 1910.176.
Where Mold Racks Deliver the Fastest ROI
Eight industries where roll-out mold drawer racking is the standard tooling storage solution.
Plastic Injection
Injection molds for consumer plastics, packaging, automotive interior trim.
Automotive Stamping
Stamping dies for body panels, structural parts, BIW tooling — 5–8 T.
Die Casting
Aluminium and zinc die-casting molds — heat-resistant drawer beds.
Rubber & Silicone
Compression and transfer molds for rubber, silicone and TPE parts.
Toolroom & Fixture
Machine shop fixtures, jigs, cutting tools, gauges, measuring fixtures.
Electronics Tooling
PCB stencils, SMT fixtures, electronics assembly jigs — light-duty.
Blow Mold
PET bottle blow molds, HDPE container molds — 200–500 kg per mold.
Heavy Forging Die
Hot forging dies for crankshafts, gears, large industrial parts — 8 T+.
How to Specify a Mold Rack Layout in 3 Decisions
Drawer capacity, crane access and aisle pull-out clearance drive 85% of total mold storage project cost. Get these three right before sizing uprights.
Drawer Capacity — Size for Heaviest Mold
Survey your mold inventory by weight band. Always spec drawer capacity for your heaviest 90th percentile mold, not the average — under-spec drawers fail catastrophically.
- ≤ 1,000 kg molds — 1 T drawer rack, 5 levels
- 1,000–3,000 kg — 3 T standard, 3–4 levels
- 3,000–5,000 kg — 5 T heavy-duty, 2–3 levels
- 5,000–8,000 kg — 8 T extra-heavy, 1–2 levels
Crane Access — Hook Height Above Top Drawer
Overhead crane hook must clear top drawer at full extension + sling height. Otherwise top drawer becomes inaccessible.
- Min hook clearance — top drawer + 1.5 m sling
- Jib crane radius ≥ drawer pull-out + 1 m
- For tall buildings, prefer 2 lower drawers vs 3 tall
- Chain hoist OK for ≤ 3 T drawers only
Aisle Width — Pull-Out + Walk Clearance
Aisle must accommodate fully-extended drawer PLUS clearance for crane hook approach and operator safety zone.
- Min aisle = drawer depth × 1.05 + 1.5 m walk
- 1.2 m drawer → 2.8 m aisle minimum
- 1.5 m drawer → 3.1 m aisle minimum
- Double-sided rack → each side needs full aisle
| Mold Weight Band | Drawer Capacity | Drawer Size | Levels per Upright | Typical Industry |
|---|---|---|---|---|
| 200 – 600 kg | 1 T light-duty | 1000 × 800 mm | 5 levels | Small injection, electronics |
| 600 – 1,800 kg | 2 T standard | 1200 × 1000 mm | 4 levels | Consumer plastics |
| 1,800 – 3,000 kg | 3 T standard | 1200 × 1000 mm | 3 levels | Auto interior, packaging |
| 3,000 – 5,000 kg | 5 T heavy-duty | 1500 × 1200 mm | 2 – 3 levels | Die casting, auto stamping |
| 5,000 – 8,000 kg | 8 T extra-heavy | 1800 × 1400 mm | 1 – 2 levels | BIW stamping, forging die |
Mold Rack vs Floor Stacking / Pallet Rack / Cantilever / Vertical Lift — Honest Pros & Cons
Which mold storage system is right for your toolroom? Compare on tool-change speed, damage risk, density, capex, crane requirement and ERP integration.
| Factor | Mold Drawer Rack | Floor Stacking | Pallet Rack | Cantilever Rack | Vertical Lift Module |
|---|---|---|---|---|---|
| Tool-Change Speed | ★★★★★ | ★★★★★ | ★★★★★ | ★★★★★ | ★★★★★ |
| Damage Risk to Mold | ★★★★★ Low | ★★★★★ Very high | ★★★★★ | ★★★★★ | ★★★★★ |
| Storage Density | ★★★★★ | ★★★★★ | ★★★★★ | ★★★★★ | ★★★★★ |
| Crane Required | Yes (jib / overhead) | Yes | Forklift only | Forklift only | Built-in extractor |
| Capex (per mold) | $$ Mid | $ Zero | $$ Low | $$ Low | $$$$$ Very high |
| Heavy Mold Capability | Up to 8 T | Unlimited | 1.5 T per beam | 2.5 T per arm | Up to 1 T typical |
| ERP / RFID Ready | ★★★★★ | ★★★★★ | ★★★★★ | ★★★★★ | ★★★★★ |
| Best For | 50–500 molds, 1–8 T | Few molds, low value | Light molds <1 T | Long dies > 2 m | 200+ small precision tools |
50+ molds, 1–8 T each, crane access
Standard solution for plastic injection, automotive stamping, die-casting. ROI from reduced tool-change downtime payback typically 12–18 months.
Hidden cost of mold damage
"Free" floor stacking causes USD 2,000–20,000/yr in mold corner-chip, paint scratch and rust damage — typically exceeds mold rack capex in year 2.
Many small, <1 T precision tools
Stencils, gauges, small dies, electronics fixtures. 90% density gain but 5–8× capex of mold rack. Only economical above 200 SKUs.
Toolrooms with mixed mold profiles
Mold rack for compact heavy dies; cantilever for long structural beams and skid-frame jigs. One unified rack catalogue from AME Rack.
Real Mold Rack Installations Around the World
Three recent projects across three continents — covering our three core configurations: standard mold rack, full-open mold rack, and beam-type pallet rack adapted for mold storage. Each shows the system type, tool inventory served, lead time and verified ROI metric.

Querétaro Plastic Injection — Standard Mold Rack
Consumer goods injection molder with 220 active molds ranging 400–2,800 kg. We delivered mixed 2 T + 3 T standard mold racks across 14 upright frames. Bar-code label slots on every drawer feed plant SAP MES — mold location lookup time dropped from 4 minutes to 8 seconds.

Stuttgart Automotive Stamping — Full-Open Mold Rack
Tier-1 automotive supplier replaced floor-stacking of body-in-white stamping dies (1–3 T each) with full-open mold rack system — 100% drawer extension gives crane direct top-access on every die. Twin-pin seismic lock standard, RFID label slot on every drawer for MES integration. Tool-change downtime reduced from 45 minutes to 12 minutes per die change.

Bursa Die-Casting Foundry — Beam-Type Pallet Rack
Aluminium die-casting foundry needed cost-effective storage for 180 low-rotation backup molds (1.5–4 T) alongside their active toolroom. We delivered beam-type selective pallet racking with custom steel cradles bolted to the pallet positions — forklift-access from the aisle, lowest cost-per-position, and crane-compatible for the heavier loads.
How AME Rack Builds Mold Drawer Racks — 6-Step Production Flow
Owned 15,500 m² Dongguan factory. Steel coil and hot-rolled section enter one end, container-loaded mold racks exit the other. Every step in-house — telescopic rails sourced from certified industrial bearing supplier, never furniture-grade.
CNC Cutting & Punching
CNC plasma cutting for 4–6 mm drawer bed plate (tolerance ±1 mm). Box-section upright punched on Amada / Yawei lines, EN 15512 slot pattern at 100 mm pitch.
Roll-Forming & Press-Braking
Box-section upright rolled and seam-welded continuously. Drawer side rails press-braked from 3–4 mm sheet. Heavy-duty 8 T uprights use hot-rolled box section pre-cut on saw line.
Robotic Welding
Panasonic / Yaskawa robots weld drawer bed plate to side rails, baseplate to upright, gusset reinforcement at rail bracket points. ISO 5817 Class B weld inspection 100% for heavy-duty drawers.
Telescopic Rail Assembly
Industrial telescopic rails (NOT furniture grade) sourced from certified bearing supplier — chrome-steel balls inside drawn-cup races. Pre-greased lithium EP-2 lubricant for 100,000+ cycle service life.
Powder Coating or HDG
7-stage pre-treatment then powder coat 60–100 μm DFT in AME Rack orange or custom RAL. HDG option: full hot-dip galvanise 80–120 μm per ISO 1461 for outdoor tool yards.
QC, Drawer Test & Container Loading
Every drawer load-tested at 1.5× rated capacity, full extension-retraction cycle test. Bundled with steel strapping + corner protectors. Drawer beds pre-greased inside rack frame for direct-out-of-container installation.
What to Send Us for a Same-Day Quote — B2B Procurement Checklist
Six inputs are all we need to produce a fully-engineered mold rack quotation. Send what you have — even an Excel mold inventory list and a smartphone photo of your toolroom is enough to start.
Mold Inventory Survey
List of molds by weight band (kg), footprint (L × W mm), peak height (mm), monthly tool-change frequency, hottest mold storage temperature (post-casting).
Toolroom Drawings
Floor plan with column locations, clear height under steel/roof, slab thickness (≥200 mm reinforced concrete for 5+ T), overhead crane bridge layout and hook capacity.
Crane / Handling Equipment
Overhead crane (capacity, span, hook height), jib crane (radius, capacity), chain hoist alternative? Drawer pull-out direction must align with crane travel.
Drawer Capacity Mix
How many drawers of each capacity (1 T / 2 T / 3 T / 5 T / 8 T)? Mix on one upright is cheaper than separate frames per capacity.
ERP / MES Integration
Bar-code, QR-code or RFID label slot required on drawer face? RFID antenna mount on upright? Hands-free reader integration with SAP / Oracle / custom MES.
Compliance & Seismic
EN 15512 (EU), AS 4084 (AU/NZ), RMI MH16 (US/Canada), local seismic code (IBC, NCh 2369, SBC, NSCP, TBDY 2018, NTC-DS, SNI 1726).
15 Procurement Questions Buyers Ask Before Placing a Mold Rack Order
Answered for toolroom managers, plant engineers, manufacturing operations heads, and procurement officers comparing 3–5 mold rack suppliers. If your question is not covered, WhatsApp Lily at +86 188 2453 7792.
01What is a mold rack and why do I need one instead of floor stacking?
02What is the maximum drawer load capacity?
03Do drawers extend 100% out of the rack for crane access?
04What rail technology do you use — industrial or furniture grade?
05What is the MOQ — can I order less than a full container?
06How long is the lead time from PO to ready-for-shipment?
07What payment terms do you accept for B2B buyers?
08Are your mold racks compliant with EN 15512 / RMI MH16?
09What steel grade do you use for mold racks?
10Can you supply heat-resistant drawer beds for die-casting?
11Do drawer racks have seismic safety locks?
12Can you integrate bar-code and RFID for ERP / MES systems?
13How much cheaper are you than European / North American brands?
14Do you provide installation supervision for heavy mold racks?
15What after-sales support do you provide for international buyers?
Ready to Spec Your Mold Rack Project?
Send your mold inventory list (Excel), toolroom dimensions, overhead crane spec and ERP / MES integration needs — receive a 3D AutoCAD layout, stamped FEA report, full BOM and FOB quotation within 4 working hours. Zero commitment, no template recycling, English / Spanish / French / Arabic communication available.