AME Rack

🏗️ Warehouse Mezzanine Floor

Warehouse Mezzanine Floor — Double Your Floor Area Without Building Expansion

The fastest way to add 50–300% more usable floor space to an existing warehouse. Free-standing structural steel platform up to 4 levels high, engineered for 350–1,000 kg/m² UDL. Goes up in 7–14 days, no permit-heavy concrete work, fully reconfigurable and movable. AME Rack delivers EN 1993 / AISC 360 / AS 4084 compliant mezzanines exported to 65+ countries.

Mezzanine FlooringMezzanine PlatformSteel MezzanineMulti-Tier MezzanineIndustrial MezzanineWarehouse PlatformStorage MezzanineRaised Storage Floor
+100–300% floor area gained EN 1993 / AISC 360 / AS 4084 10-year structural warranty
350–1,000KG/M² UDL
2–4LEVELS HIGH
2.5–5 mHEAD CLEARANCE
35 daysSTANDARD LEAD TIME
📦 What Is This Product

Mezzanine Floor — An Extra Building Inside Your Building

A warehouse mezzanine floor (also called mezzanine flooring, steel mezzanine, raised storage floor or multi-tier platform) is a free-standing structural steel platform that creates one or more additional working levels inside an existing high-bay warehouse. No connection to building columns required — the mezzanine carries its own load directly to the slab via dedicated steel columns.

Used wherever a tall building has unused vertical volume: pick & pack zones, light goods storage, office space, packing stations, returns processing, e-commerce fulfilment, automotive parts, retail back-room, even cold storage. Modular bolt-together design = relocatable, expandable, and depreciable on a different schedule from the building.

StructureFree-standing bolt-together steel
Levels1, 2, 3 or 4 tier configurations
Loading350 – 1,000 kg/m² UDL
PermitUsually no building permit needed
3-tier warehouse mezzanine floor with pick-pack workstations
3-tier mezzanine + integrated pallet rack columns, 500 kg/m² UDL
⭐ Benefits

Why Mezzanine Floors Pay Back Within 18 Months

Eight engineering and commercial advantages that explain why mezzanine flooring is the highest-ROI storage upgrade for any warehouse with unused vertical volume — beating new construction by 5–10× per square metre.

📐

+100–300% Floor Area

Add 1–3 extra working levels to an existing warehouse with zero building expansion. Typical 2-tier mezzanine doubles usable floor area on the same footprint.

💰

Lowest Cost Per m²

USD 90–180/m² installed for steel mezzanine vs USD 800–1,500/m² for new warehouse construction — 5–10× cheaper per square metre of usable space.

7–14 Day Build

Bolt-together modular system goes up in 7–14 days vs 6–18 months for new building. Zero concrete work, zero structural building permit in most jurisdictions.

🔁

Fully Relocatable

Bolt-together design means you can disassemble, move and re-erect in a new lease — protects capex when relocating. Resale value 50–70% of new after 5 years.

🏗️

Free-Standing

Carries own load to slab via dedicated columns — no attachment to building columns or walls. Existing building structure remains untouched, landlord-approval friendly.

⚙️

Integrated Rack Columns

Optional rack-supported mezzanine — pallet rack uprights double as mezzanine columns. Cheaper, denser, but loses relocatability.

🔥

Fire & Sprinkler Compliant

NFPA 13 / EN 12845 sprinkler clearance maintained. Optional intumescent fire-rated coating for 1-hour fire resistance. EU IFC and US IBC compliant.

📐

EN 1993 / AISC 360

Engineered to EN 1993 (Eurocode 3), AISC 360 (US), AS 4084 (AU/NZ). Stamped FEA report by registered PE provided on request — required by most insurance & building authorities.

🏷️ Product Types

Six Mezzanine Floor Configurations for Every Operation

From free-standing 2-tier storage mezzanine to multi-level pick-pack centres and cold-rated platforms — match the structure, finish, and integration level to your operation.

🅰️

Free-Standing Mezzanine

Standalone steel structure with dedicated columns. Fully relocatable, no building attachment. The volume seller — 70% of projects.

🏗️

Rack-Supported Mezzanine

Pallet rack uprights double as mezzanine columns — denser layout, lower cost per m². Trade-off: loses relocatability.

⬆️

Multi-Tier Mezzanine (3–4 levels)

Stacked 3 or 4 levels high in tall buildings (10+ m clear). Maximum cube utilisation for pick-pack, light storage and offices.

🛒

Pick & Pack Mezzanine

Conveyor cut-outs, pallet drop zones, workstation power and lighting integrated. Standard for e-commerce fulfilment centres.

❄️

Cold-Storage Mezzanine

HDG finish + thermal-break columns. Operates at 2–8°C chilled or -25°C frozen — adds vertical space inside refrigerated cells.

🔥

Fire-Rated Mezzanine

Intumescent coating + cement-board ceiling for 60-minute or 120-minute fire rating per EN 13501 / ASTM E119. Required in many EU and US jurisdictions.

📊 Specifications

Engineered Technical Parameters — 4 Standard Configurations

Standard catalogue spec range. All parameters fully customisable — send building drawings, intended use, max load and aisle layout for project-specific engineering.

ParameterLight-Duty StorageStandard Pick & PackHeavy-Duty IndustrialMulti-Tier (3–4 level)
UDL Load Capacity350 kg/m²500 kg/m²800 – 1,000 kg/m²500 kg/m² per tier
Point Load (per m²)250 kg400 kg700 kg400 kg
Tier Count1 – 2 levels1 – 2 levels1 – 2 levels3 – 4 levels
Head Clearance per Tier2.4 – 3.0 m2.5 – 3.0 m2.8 – 3.5 m2.5 m typical
Column Spacing4.0 × 6.0 m typical3.5 × 5.0 m3.0 × 4.5 m3.0 × 4.0 m
Main Beam ProfileHot-rolled IPE 160IPE 180 / 200IPE 240 / HEA 200IPE 220 / HEA 180
Joist ProfileC 120 × 50 × 4C 160 × 60 × 5IPE 140 / 160C 160 × 60 × 5
Column ProfileBox 100 × 100 × 4Box 125 × 125 × 5Box 150 × 150 × 6Box 150 × 150 × 6
Steel GradeQ235BQ235B / Q345BQ345B (S355JR)Q345B (S355JR)
Decking Material38 mm chipboard P538 mm chipboard P54 mm steel plate38 mm chipboard P5
Top CoatingStandard finishAnti-slip vinyl 2 mmAnti-slip steel checkerAnti-slip vinyl 2 mm
FinishPowder coat 60 μmPowder coat 80 μmPowder coat 80–100 μmPowder coat 80 μm
Handrail / StairIncluded 1.1 m highIncluded + kickplateHeavy-duty includedPer tier included
Anchor SpecM16 × 110 mmM20 × 150 mmM24 × 170 mmM20 × 150 mm
ComplianceEN 1993 / AISC 360EN 1993 + EN 1991 imposedEN 1993 + AISC 360 + AS 4084EN 1993 + dynamic FEA
Lead Time30 days35 days40 days45 days
FOB Price (USD/m²)$ 70 – 110$ 95 – 145$ 145 – 220$ 165 – 240
📌 Engineering Note: Slab capacity is the #1 mezzanine constraint — every column transfers point load to the floor slab. Standard 150 mm reinforced concrete slab handles up to ~8 T per column foot; for heavy-duty industrial mezzanines you may need pad foundations. We will calculate column reactions in the FEA and indicate if slab strengthening is required.
🔩 Components

Every Column, Beam and Deck Panel — In-House Manufactured

Ten core components engineered, welded and coated under one roof at AME Rack's 15,500 m² Dongguan plant. Hot-rolled structural sections sourced from Baosteel / Shagang under annual contracts.

01

Steel Column

Hot-rolled box section 100×100×4 mm to 150×150×6 mm Q345B steel, welded baseplate, 4–6 anchor holes for M16/M20/M24 chemical bolts.

02

Main Beam (Primary)

Hot-rolled IPE 160 to IPE 240 / HEA 200 spanning between columns. Carries joist load through to column. Bolted clip connection per EN 1090.

03

Joist (Secondary)

Cold-formed C-section 120×50 mm to IPE 160 spanning between main beams at 1.0 m centre. Supports decking and live load.

04

Decking Panel

38 mm P5 moisture-resistant chipboard (EU standard) OR 4 mm steel checker plate (heavy-duty). Pre-cut to bay size, tongue-and-groove edge.

05

Top Surface

Optional 2 mm anti-slip vinyl topping bonded to chipboard for pick-pack zones — soft on operator feet. Steel checker plate for industrial loading dock applications.

06

Handrail System

1.1 m tall handrail with 100 mm kickplate per OSHA 1910.29 / EN 14122-3. Powder-coated yellow or AME Rack orange. Removable for pallet drop zones.

07

Staircase

Standard 1.0 m wide steel stair with chequer plate treads, handrail both sides, 30–45° pitch. Custom widths and switchback configurations available.

08

Pallet Drop Gate

Self-closing safety gate at pallet drop zones — operator can never be exposed to drop edge while loading from below. Mandatory per OSHA 1910.29.

09

Column Protector

Yellow HDPE + steel hybrid guard at every ground-level column, 600 mm tall, replaceable when struck by forklift.

10

Load Capacity Sign

Aluminium sign at staircase entry and at every column — max UDL kg/m², max point load, total bay capacity. Mandatory under OSHA 1910.176 and EN 1991.

📐 Design Guide

How to Specify a Mezzanine Floor in 3 Decisions

UDL loading, head clearance and slab capacity drive 85% of total mezzanine project cost. Get these three right BEFORE quoting — over-spec wastes capex, under-spec creates safety hazard and code violation.

1

UDL — Match Load to Intended Use

Uniformly distributed load (UDL) in kg/m² is the single biggest cost driver. Pick from standard tiers — don't custom-spec without reason.

  • 350 kg/m² — light storage, office
  • 500 kg/m² — pick & pack, light shelving
  • 800 kg/m² — pallet rack on mezzanine
  • 1,000 kg/m² — industrial / machine room
2

Head Clearance — Above & Below

Both ground level (below mezz) and upper level (under building roof) must clear forklift mast, pallet height + sprinkler.

  • Min ground clearance — forklift mast + 200 mm
  • Min upper clearance — operator + sprinkler 600 mm
  • Building clear height ≥ 5.5 m for 2-tier
  • Building ≥ 8 m for 3-tier multi-level
3

Slab Capacity — Point Load per Column

Every column transfers load to slab — calculate point load and verify slab can take it. Standard 150 mm reinforced slab usually OK to 8 T per column.

  • Column load = UDL × tributary area × tiers
  • Standard slab 150 mm — up to 8 T per column
  • Need pad foundation if column load > 8 T
  • Send slab age + rebar spec for stamped check
📊 Intended Use → Recommended UDL Spec (per EN 1991-1-1 imposed loads)Use code-compliant spec — over-engineering wastes capex
Intended UseUDL RequiredPoint LoadDecking TypeTop Coating
Office / Light Storage250 – 350 kg/m²200 kg / m²38 mm chipboardVinyl 2 mm
Document Archive500 kg/m²400 kg / m²38 mm chipboardVinyl 2 mm
Pick & Pack Workstation500 kg/m²400 kg / m²38 mm chipboardAnti-slip vinyl 2 mm
Light Shelving Storage500 – 700 kg/m²500 kg / m²38 mm chipboard P5Vinyl 2 mm
Pallet Rack on Mezzanine800 – 1,000 kg/m²700 kg / m²4 mm steel plateChecker plate
Industrial / Machine Room1,000 kg/m²+Custom per load6 mm steel plateChecker plate
📌 Engineering Tip: If unsure about future use, spec the next tier UP — incremental cost is 8–12% but retrofitting load capacity later requires demolition. Most successful projects spec 500 kg/m² for pick & pack with structural reserve for 700 kg/m² future shelving conversion.
⚖️ Comparison

Mezzanine vs New Build / Rented Space / Tall Pallet Rack / Multi-Tier Shelving — Honest Pros & Cons

Which floor-area expansion approach is right for your warehouse? Compare on cost per m², lead time, relocatability, building permit and capex flexibility.

FactorMezzanine FloorNew BuildingRent More SpaceTall Pallet Rack VNAMulti-Tier Shelving
Cost / m² (installed)USD 90–180USD 800–1,500Ongoing rentUSD 120–250USD 60–120
Build / Move Time7–14 days6–18 months30–90 days5–10 days install5–7 days install
Building PermitUsually noneFull permit packNoneNoneNone
Floor Area Added+100–300%UnlimitedUnlimited+50% (vertical)+50% (vertical)
Relocatable★★★★★★★★★N/A★★★★★★★★★
Suits Light Goods Pick★★★★★★★★★★★★★★★★★★★★★★★★
Suits Heavy Pallets★★★★★★★★★★★★★★★★★★★★★★★
Best ForTall building, fast ROILong-term, owned landShort-term flexPallet densityHand-pick small parts
✅ Pick Mezzanine When…

Tall building, light-medium load

You have ≥ 5.5 m clear height, need to double floor area in < 30 days, want a relocatable asset that depreciates on equipment schedule, not building schedule.

⚠️ Skip Mezzanine When…

Building < 5 m or heavy pallet only

Below 5 m clear, the upper level becomes unusable. For pallet-only operations, VNA or selective rack delivers better density without the capex of a structural platform.

↔️ Pick Multi-Tier Shelving When…

Pure manual hand-pick small parts

If 100% of work is hand-pick of small SKUs (no pallet handling on the mezzanine), purpose-built multi-tier shelving (Boltless / Longspan / Mini-Load) is 30–40% cheaper per usable m².

🔁 Mezzanine + Rack Combo

Modern e-commerce fulfilment

Multi-tier mezzanine with selective pallet rack on ground floor (reserve), pick-face shelving on upper tiers. The standard architecture for high-volume e-commerce DCs.

📍 Case Studies

Real Mezzanine Installations Around the World

Three recent projects across three continents — e-commerce pick-pack, automotive parts DC and retail back-room. Each shows tier count, floor area added, lead time and verified ROI metric.

🇦🇪 UAEDubai e-commerce 3-tier pick-pack mezzanine

Dubai E-commerce Fulfilment — 3-Tier Pick-Pack

8,500 m² building · 3 tiers + ground · 11 m clear · BS EN 1993 + UAE seismic

Pan-Gulf marketplace seller tripled usable floor from 8,500 to 25,500 m² with a 3-tier free-standing mezzanine. 500 kg/m² UDL, integrated conveyor cut-outs, pallet drop gates at every tier. Total project handed over in 16 days. Avoided AED 22 million new-building investment vs AED 3.5 million mezzanine capex.

+17,000 m²Floor added
42 daysFOB lead
16 daysOn-site build
🇺🇸 USAHouston automotive parts mezzanine rack supported

Houston Automotive Parts DC — Rack-Supported Mezzanine

12,000 m² building · 2 tiers · 9.5 m clear · AISC 360 + IBC + sprinkler NFPA 13

OEM parts distributor needed dense small-parts pick face above pallet reserve. Rack-supported mezzanine — pallet rack uprights double as mezzanine columns. 800 kg/m² UDL upper tier, ground floor pure selective pallet. 4 mm steel plate decking with checker top. Saved 28% per usable m² vs free-standing alternative.

+9,800 m²Floor added
40 daysFOB lead
-28%Cost / m²
🇯🇵 JapanTokyo retail back-room mezzanine office combined

Tokyo Retail Back-Room — Office + Stockroom Combined

2,200 m² building · 2 tiers · 7 m clear · BCJ approval + seismic ALA-202

Major Japanese fashion chain converted 8 store back-rooms with identical 2-tier mezzanine — stockroom on ground floor, store office and meeting rooms above. Powder-coated white finish, anti-slip vinyl flooring, glass partition walls. Full BCJ Japan building approval bundled with our FEA report. Replicated 8× in same year.

+1,900 m²Per store
32 daysFOB lead
8 storesSame design
🏭 Manufacturing

How AME Rack Builds Mezzanine Floors — 6-Step Production Flow

Owned 15,500 m² Dongguan factory. Hot-rolled structural sections enter one end, container-loaded mezzanine kits exit the other. EN 1090-2 EXC2 welder qualification, ISO 5817 Class B weld inspection.

Step 1 🛠️

Hot-Rolled Steel Cutting

CNC saw and plasma cutting for IPE / HEA / HEB / box-section structural sections sourced from Baosteel / Shagang. Tolerance ±1 mm per EN 1090-2 EXC2. Material traceability via mill test certificate.

Step 2 🌀

Roll-Forming & Press-Braking

Cold-formed C-section joists and baseplates roll-formed on dedicated lines. Heavy plate press-braked for column baseplates and bracket gussets.

Step 3

Robotic Welding (EN 1090 EXC2)

Panasonic / Yaskawa robotic MIG welding for column-to-baseplate, beam-to-joist clip brackets, gusset plates. Welder qualification per ISO 9606-1. Full-penetration weld inspection per ISO 5817 Class B.

Step 4 🧪

Acid Pickling & Phosphating

7-stage pre-treatment: alkaline degrease → rinse → acid pickle → rinse → zinc-phosphate → rinse → DI rinse. Adhesion ≥6N/cm cross-cut test per ISO 2409. Mandatory before powder coat.

Step 5 🎨

Powder Coating / Intumescent Coating

Standard: powder coat 60–100 μm DFT in AME Rack orange or RAL custom. Fire-rated: intumescent coating for 60-min or 120-min fire resistance per EN 13501 / ASTM E119.

Step 6 📦

QC, Pre-Assembly Test & Container Loading

Critical structural connections sample-assembled and load-tested at 1.5× design load before disassembly. Decking panels pre-cut to bay size. Compact bundling — average 800–1,200 m² mezzanine per 40HQ.

15,500 m²Owned factory
EN 1090EXC2 welder cert
1.5×Load tested
35 daysStandard lead
📋 Buying Guide

What to Send Us for a Same-Day Quote — B2B Procurement Checklist

Six inputs are all we need to produce a fully-engineered mezzanine quotation with stamped FEA. Send a hand-drawn floor sketch + intended use spec — we can work from minimal information.

01

Building Drawings

Floor plan with building columns marked, clear height under steel/roof, slab age + thickness + rebar spec, sprinkler layout, fire-exit routes.

02

Intended Use & UDL

Light storage, pick-pack, pallet rack on mezz, office, machine room? Required UDL kg/m² and point load. Future-proofing margin if SKU/operation may change.

03

Tier Count & Clearance

1, 2, 3 or 4 tiers? Minimum head clearance per tier (ground 2.5 m, upper 2.4 m typical). Forklift mast height needed if pallet handling below.

04

Integration Items

Conveyor cut-outs, pallet drop zones, stair locations, lift / goods lift opening, fire-exit stairs, sprinkler clearance, ceiling lighting, power outlets.

05

Fire & Safety Code

NFPA 13 / EN 12845 sprinkler clearance, BCA / NCC / IBC structural code, EN 14122 stair / handrail, OSHA 1910.29 fall protection. Fire-rated coating required?

06

Slab Capacity Report

Send slab compressive strength + thickness + rebar spec. If unavailable, we will commission third-party slab test before quoting (USD 800–1,500 typical).

❓ FAQ — B2B Procurement

15 Procurement Questions Buyers Ask Before Placing a Mezzanine Order

Answered for facility managers, operations heads, supply chain officers and procurement teams comparing 3–5 mezzanine suppliers. If your question is not covered, WhatsApp Lily at +86 188 2453 7792.

01What is a warehouse mezzanine floor and how does it work?
A warehouse mezzanine floor (also called mezzanine flooring, steel mezzanine, raised storage floor or multi-tier platform) is a free-standing structural steel platform that creates one or more additional working levels inside an existing high-bay warehouse. The mezzanine carries its own load to the slab via dedicated steel columns — no connection to building columns required. Modular bolt-together design installs in 7–14 days with no concrete work and typically no building permit.
02How much usable floor area can a mezzanine add?
A 2-tier mezzanine typically doubles usable floor area (+100%) on the same footprint. 3-tier mezzanine adds +200%, 4-tier (in 10+ m clear buildings) adds +300%. Real-world ROI: Dubai e-commerce project tripled an 8,500 m² building to 25,500 m² usable floor at 1/6 the cost of new construction.
03Do I need a building permit for a mezzanine floor?
In most jurisdictions, no — a free-standing mezzanine is classified as removable equipment, not building modification. Permit exceptions: structural-attached mezzanines, projects exceeding fire-code occupant load limits, or jurisdictions with conservative interpretation. We provide stamped engineering drawings (EN 1993 / AISC 360 / AS 4084) that satisfy most fire marshal and insurance reviews.
04What load capacity (UDL) should I specify?
Match UDL to your intended use: 350 kg/m² for office and light storage, 500 kg/m² for pick-pack and light shelving, 800 kg/m² for pallet rack on mezzanine, 1,000 kg/m² for industrial machine rooms. Over-spec wastes capex; under-spec creates safety hazard. We recommend speccing one tier up from current need to allow future use changes — only 8–12% extra cost.
05How much building clear height do I need?
Minimum building clear height: 5.5 m for 2-tier mezzanine (2.5 m ground + 2.4 m upper + 600 mm structure/sprinkler clearance), 8 m for 3-tier, 10.5 m for 4-tier multi-level. Below 5 m clear, the upper level becomes too cramped for human operation — better to consider VNA tall pallet rack instead.
06What is the MOQ — can I order a small mezzanine?
Minimum order is 200 m² (approximately 1 × 20GP container). For projects below 200 m², we can combine your shipment with another customer's container to the same destination port. Small mezzanines under 100 m² are quotable but unit pricing is 20–30% higher due to fabrication minimum batch.
07How long is the lead time from PO to ready-for-shipment?
Light-duty storage mezzanine: 30 days. Standard pick-pack: 35 days. Heavy-duty industrial 1,000 kg/m²: 40 days. Multi-tier 3–4 level: 45 days. Fire-rated (intumescent coating): add 5 days. Engineering iteration (slab survey, FEA stamping, customer drawing review) before production starts usually adds 7–14 days.
08What payment terms do you accept for B2B buyers?
Standard terms: 30% T/T deposit on PO confirmation, 70% balance against B/L copy before vessel sails. Alternative: 100% irrevocable L/C at sight from a top-50 bank. For enterprise customers with 3+ orders, we also offer OA 30/60 against credit insurance (Sinosure / Coface).
09Is your mezzanine compliant with EN 1993 / AISC 360 / AS 4084?
Yes. Engineered to EN 1993 (Eurocode 3 — EU), AISC 360 (US), AS 4084 (Australia/NZ), plus EN 1991-1-1 imposed loads. Welder qualified per ISO 9606-1, fabrication per EN 1090-2 EXC2. Stamped FEA reports run in RFEM 5 / ETABS provided on request — accepted by most insurance providers and municipal building authorities worldwide.
10What steel grade do you use?
Standard mezzanine: Q235B hot-rolled structural sections. Heavy-duty 1,000 kg/m² and multi-tier: Q345B equivalent to S355JR European spec (yield ≥345 MPa). Hot-rolled sections (IPE / HEA / HEB) sourced from Baosteel / Shagang under annual contracts. Full mill test certificates (MTC) provided with every shipment.
11Can the mezzanine be relocated to a new warehouse later?
Yes — that's the killer feature. Bolt-together design means full disassembly and re-erection in a new lease. Resale value typically 50–70% of new after 5 years. Avoid rack-supported variant if relocation is likely (rack-supported is cheaper but loses relocatability). Plan re-erection at 60% of original install labour cost — most components reusable.
12What about fire-rated mezzanines?
Yes — we supply 60-minute and 120-minute fire-rated mezzanines with intumescent coating per EN 13501 / ASTM E119. Required in many EU and US jurisdictions when mezzanine occupant load exceeds 10 people or when used for high-fire-risk operations. Add cement-board ceiling and rated stair enclosure for full compartmentation. Fire-rating adds 18–25% to base price.
13How much cheaper are you than European brands?
For equivalent EN 1993 + AISC 360 spec, AME Rack direct factory pricing is typically 30–45% below European brand-name suppliers (Mecalux, AR Racking, Stow, Constructor) and 25–35% below North American brands (Cubic Designs, Steele Solutions, PWI). We own the 15,500 m² plant outright and procure structural steel via annual mill contracts.
14Do you provide installation supervision?
Yes — optional, USD 350/day + travel/visa. Typical 1,000 m² 2-tier mezzanine needs 7–10 days supervision; multi-tier projects 10–14 days. Strongly recommended for first-time projects — alignment of column baseplates to within ±5 mm is critical for tier-to-tier load distribution. Local crew handles labour; AME Rack supervisor ensures correct sequence and bolt torque.
15What after-sales support do you provide for international buyers?
Free part list with every order for future expansion (3-year price-lock on commodity components). Spare-parts shipment within 14 days by air or sea. Re-engineering service if you reconfigure or relocate the mezzanine — we update your FEA report and drawings free for 3 years post-installation. WhatsApp / email response within 4 working hours, Mon–Sat. English / Spanish / French / Arabic.

Ready to Spec Your Mezzanine Floor Project?

Send building drawings, intended use, UDL requirement and tier count — receive a 3D AutoCAD layout, stamped EN 1993 / AISC 360 FEA report, full BOM and FOB quotation within 4 working hours. We co-engineer with your local fire marshal and building authority. Zero commitment, English / Spanish / French / Arabic communication available.

📐 Free FEA + slab check🏗️ Up to 4 tiers🛡️ 10-yr structural warranty🌍 Shipped to 65+ countries

Get a free quote quickly

AME Rack quotation