AME Rack

🏭 Injection Mold & Mould Storage

Mold Storage Racking — Engineered to Hold 3-Tonne Dies, Cut Change-Over Time & Eliminate Floor Waste

A purpose-built racking architecture for injection moulding plants, stamping shops, die-casting facilities and mould-maintenance hubs: standard mold racks, full-open heavy-duty mold racks with drawer-out design, and heavy-duty selective pallet racks — all engineered for 500–3,000 kg single-mould loads, crane or forklift access, and SMED-friendly die-change workflow.

Used by injection, stamping, die-cast plants 3,000 kg per drawer rated 10-year structural warranty
3,000 kgPER DRAWER CAPACITY
-73%DIE-CHANGE TIME CUT
+70%FLOOR SPACE RECOVERED
48hLAYOUT + QUOTE TURNAROUND
⭐ At-a-Glance — Mold Storage Quick Facts

Mold & Mould Storage Racking, Summed Up in 10 Quick Facts

  • Best rack mix: Standard mold rack + Full-open heavy-duty mold rack + Heavy-duty selective — the three-tier mold-shop layout.
  • Capacity per drawer: Standard 1,000–2,000 kg; full-open heavy-duty 2,000–3,000 kg; XXL configurations up to 5,000 kg.
  • Die-change SMED: Drawer-out design cuts mould change-over from 45 min to 12 min — direct hit on production OEE.
  • Access method: Crane loading for > 2,000 kg moulds; forklift for < 1,500 kg; full-open drawers support both.
  • Floor space saving: Vertical mold racks recover 60–70% of floor area vs traditional floor storage.
  • Drawer slide rating: Heavy-duty bearing slides rated to 3× working load for safe full-extension operation.
  • Surface protection: PE-coated drawer surfaces protect parting lines, cavities and polished mould faces from contact damage.
  • Mould ID traceability: Bay-level signage, colour-coded zones and optional RFID tagging integrate with MES / ERP systems.
  • Compliance: EN 15512 · AS 4084 · RMI MH16 · FEM 10.2.02 + mould-shop crane clearance design rules.
  • AME Rack lead time: Standard 25–30 days FOB Shenzhen; XXL drawers add 5–7 days for bearing slide fabrication.
🩹 Mold Storage Pain Points

If You Run a Tooling Shop, You've Lived These 6 Production Killers

We've designed mold racking for injection moulders, stamping shops and die-casting plants across 65 countries. Six failure patterns come up in nearly every kick-off — each one bleeds OEE and production margin.

🏗️ Floor Storage Waste

"60% of tool-room floor is moulds on pallets"

Heavy injection moulds (1–3 tonnes each) sit on floor pallets because standard racking can't hold them. Floor storage wastes 60–70% of available cube and blocks crane access paths.

AME Rack FixVertical mold racks with 3,000 kg drawer rating; recover 70% of floor area.
⏱️ Slow Die Change

"Mould change-over kills 45 min per swap"

Searching for the right mould, hooking up the crane, manoeuvring to the press — manual die-change takes 45+ min per swap. Multiplied across 12 daily changes that's 9 hours of lost production.

AME Rack FixFull-open drawer-out design + zoned slotting cuts change-over to 12 minutes.
💥 Mould Damage

"Forklift gouged a $40K parting line"

Moulds stored on plain floor or open shelves get hit by forklifts, dropped from cranes, or scratched against adjacent moulds. Every damage event is a 1–3 week repair plus production downtime.

AME Rack FixPE-coated drawer surfaces + dedicated slot per mould; zero mould-on-mould contact.
💧 Rust & Corrosion

"Stored moulds rusted during the rainy season"

Cooling channels and parting lines accumulate condensate in high-humidity environments. After 3–6 months of storage, rust spots require expensive polishing or refinishing.

AME Rack FixEnclosed mezzanine zones + VCI paper-friendly slots maintain dry storage environment.
🔍 ID Mix-Up

"Wrong mould loaded — wrong part cavity for the order"

Mould part numbers are stamped on small plates that get covered in oil or rust. Wrong mould loaded into the press = entire production batch scrap + customer return.

AME Rack FixBay-level signage + colour-coded zones + optional RFID tag per mould slot.
📋 ISO / IATF Audit

"Auditor flagged unsecured tooling storage"

ISO 9001 / IATF 16949 / TS 16949 audits require traceable tooling storage with stamped structural certification. Floor-stored moulds and unbranded shelving trigger findings.

AME Rack FixFree FEA report + EN 15512 / AS 4084 compliance pack + IATF-friendly design language.
📦 Recommended Rack Types

4 Racking Systems Built for Mold & Mould Storage

A mold-shop rarely uses one rack type. Below are the four configurations we deploy in injection moulding plants, stamping facilities, die-casting shops and heavy-press die stores — combined to maximise floor density, accelerate die-change and protect tooling investment from 1 T to 8 T per position.

01 Entry Level Standard Mold Rack 1000kg drawer for small injection moulds by AME Rack

Standard Mold Rack

Drawer-out mold racking with bearing slides — rated to 1,000 kg per drawer. The entry-level workhorse for injection moulders handling small to mid-size moulds. Cuts die-change time from 45 min to under 20 min.

Capacity1,000 kg / drawer
AccessDrawer-out + crane
Best ForSmall–mid injection moulds
02 Volume Seller Full-Open Mold Rack 1000-3000kg 100% drawer extension for injection and die-cast moulds by AME Rack

Full-Open Mold Rack

100% full-extension drawer design — 1,000–3,000 kg per drawer. Drawer fully clears the upright so the overhead crane can lift directly from above with zero obstruction. The volume seller across injection, stamping and die-casting shops.

Capacity1,000–3,000 kg / drawer
Access100% full pull-out
Best ForMid–heavy production moulds
03 Pallet-Mount Heavy-Duty Selective Pallet Racking for pallet-mounted mould storage by AME Rack

Selective Pallet Rack for Moulds

Heavy-duty selective racking adapted for mould storage — 1,000–4,000 kg per pallet position on reinforced steel cradles or bolted-down carriers. Forklift access, lowest cost-per-position, ideal for low-rotation mould archives and overflow inventory.

Capacity1,000–4,000 kg / pallet
AccessForklift direct
Best ForMould archive, overflow
04 Ultra Heavy H-Steel Ultra Heavy-Duty Mold Rack 5000-8000kg for large stamping and forging dies by AME Rack

H-Steel Ultra Heavy-Duty Mold Rack

Hot-rolled H-beam column and cross-member construction rated to 5,000–8,000 kg per position. Purpose-built for large stamping dies, forging tools and heavy-press moulds where standard cold-formed racks simply cannot carry the load. Crane-only access with reinforced anchor plates.

Capacity5,000–8,000 kg / position
AccessOverhead crane only
Best ForLarge stamping / forging dies
🏆 Real Project Cases

Mold Storage Builds Cutting Change-Over Time on Real Plants

Three recent tooling storage installations where AME Rack designed the full mold racking architecture. Names, scales and operating duration available with signed buyer feedback on request.

2020EU Injection European injection moulding plant mold racking project by AME Rack

Heavy-Duty Mold Racks for EU Injection Plant

40 full-open heavy-duty mold racks rated 2,500 kg each for a German injection moulding plant supplying an automotive Tier 1 supplier. Die-change time fell from 42 min to 11 min — a 73% SMED improvement validated by independent OEE audit.

40 racksHEAVY-DUTY
2,500 kgPER DRAWER
-73%DIE-CHANGE TIME
2022CN Die-Cast Chinese die-casting plant XXL mold rack project by AME Rack

XXL Mold Racks for Chinese Die-Casting Plant

XXL drawer-rack configuration rated 4,000 kg per drawer for a Chinese aluminium die-casting plant handling large-press tooling. Recovered 1,200㎡ of floor area previously wasted on pallet-stored dies; cut maintenance crew search time by 65%.

4,000 kgPER DRAWER
1,200㎡FLOOR RECOVERED
-65%SEARCH TIME
2024SE Asia Stamping SE Asian stamping plant mold rack project by AME Rack

Standard Mold Racks for SE Asian Stamping Plant

30 standard mold racks (1,000 kg/drawer) for a Vietnamese stamping plant supplying an OEM truck programme. Mixed crane + forklift access design accommodated existing tool-room equipment without capex on new lifting gear.

30 racksSTANDARD MOLD
1,000 kgPER DRAWER
+70%FLOOR USE
⚙️ Technical Specifications

Mold & Mould Racking Engineering Specs

The parameters tool-room managers, plant engineers and Tier 1 supplier procurement teams ask for first. Full datasheets and stamped FEA reports issued free with every project — IATF-compatible documentation language available on request.

← Swipe table horizontally →
ParameterStandard MoldFull-Open HD MoldXXL MoldHD SelectiveMezzanine
Capacity per Drawer / Pair1,000–2,000 kg2,000–3,000 kgUp to 8,000 kgUp to 4,000 kg500–800 kg/㎡
Drawer Extension80–100%100% full-open100% full-openn/an/a
Access MethodCrane + forkliftCrane + forkliftCrane onlyForkliftManual + light hoist
Drawer Slide TypeStandard bearingHD bearingXXL bearing + lockn/an/a
Standard Height3–4 m (3–4 levels)3–5 m (3–4 levels)3–5 m (2–3 levels)4–8 m2–3 tiers
Steel GradeQ345BQ345B heavy gaugeQ345B XXL gaugeQ345BQ345B + H-beam
Upright Gauge3.0–4.0 mm4.0–5.0 mm5.0–6.0 mm2.5–3.0 mm3.0–4.0 mm
Surface ProtectionPE-coated drawerPE-coated drawerPE-coated drawerPowder coatPowder coat
Coating DFT80–100 μm80–120 μm80–120 μm60–100 μm80–120 μm
ComplianceEN 15512 · AS 4084 · RMI MH16 · FEM 10.2.02 · IATF-friendly documentation
Crane Clearance DesignCustom per project — verified during 3D layout phase
Typical Lead Time25 days25–30 days30–35 days20 days25–35 days
📋 Tender-ready packs: all parameters above issued as PDF datasheet, Excel BOM and CAD/STEP files. FEA report stamped by our chartered engineer included free. For IATF 16949 audited operations we provide IATF-aligned design language and traceable serial numbers. Email Lily@amerack.com.
🧭 Decision Guide

How to Choose: When A vs B for Your Tool Room

Six trade-off decisions specific to mold and mould storage. Use these as the first-pass filter before requesting a detailed layout from our tooling-storage engineering desk.

Weight Class

Standard Mold Rack vs Full-Open HD Mold Rack?

Standard Mold Rack for moulds up to 2,000 kg with 80–100% drawer extension — best capex efficiency for typical injection plants. Full-Open HD Mold Rack mandatory for moulds 2,000–3,000 kg requiring 100% drawer extension for direct crane lift — cuts die-change time by additional 30%.

Storage vs Frequency

Mold Rack vs Heavy-Duty Selective?

Mold Rack (drawer-out) for any mould stored more than 30 days — drawer access cuts die-change time and protects mould faces. Heavy-Duty Selective only for moulds shipped on standardised pallets where crane access is not available.

Lifting Equipment

Crane Access vs Forklift Access?

Crane Access mandatory for moulds > 2,000 kg — forklift mast capacity and pallet stability become unsafe above that weight. Forklift Access acceptable for moulds < 1,500 kg with pre-fitted lifting eye-bolts. Many shops use mixed access: forklift on lower drawers, crane on upper.

Floor Use vs Capex

Vertical Mold Rack vs Floor Storage?

Vertical Mold Rack wins on every metric — recovers 60–70% of tool-room floor area, accelerates die-change, protects mould surfaces, traceable to IATF audit. Floor Storage only acceptable for moulds > 5,000 kg or used less than 4 times per year.

SMED Optimisation

How to design for SMED die-change?

Four engineering tools: (1) full-open drawer-out racks — zero search time, mould fully exposed for crane; (2) zoned slotting by mould family — related moulds stored close to the right press; (3) bay-level signage + RFID for instant ID verification; (4) crane-clearance aisle design — direct hook-up without manoeuvring.

Anti-Rust Strategy

How to prevent mould rust during long-term storage?

Three engineering tools: (1) enclosed mezzanine zones with controlled humidity (<55% RH); (2) VCI paper-friendly drawer slots for chemical rust inhibition; (3) PE-coated drawer surfaces to prevent water pooling. Critical for moulds stored more than 90 days between production runs.

📊 Comparison Table

Side-by-Side: Which Mold Rack Wins for Your Tool Profile

Five rack types × eight tool-room criteria — the shortcut most tool-room managers wish they had before issuing the RFP. Use to narrow rack mix per mould weight class, lifting equipment and change-over frequency.

← Swipe table horizontally →
Selection CriteriaStandard MoldFull-Open HDXXL MoldHD SelectiveMezzanine
500–2,000 kg Mould★★★★★★★★★★★★★★★
2,000–3,000 kg Mould★★★★★★★★★★★★★★★
3,000+ kg Mould★★★★★★★★★★★
Die-Change Speed (SMED)★★★★★★★★★★★★★★★★★★
Floor Recovery vs Floor Storage★★★★★★★★★★★★★★★★★★★★★★
Capex (per mould stored)$$ Mid$$$ High$$$$ Very High$ Low$$ Mid
IATF / ISO Audit Friendly★★★★★★★★★★★★★★★★★★★★★
Best Match OperationInjection plantHeavy injection / die-castLarge-press / forgingPalletised mould stockInserts & accessories
💡 Reading the table: ★★★★★ = excellent, ★ = poor. No single rack wins all categories — successful tool rooms combine 2–4 systems mapped to mould weight class, change-over frequency and lifting equipment. Email Lily with your mould weight distribution and we'll model the optimal layout at zero cost.
❓ FAQ — 15 Questions

Mold Storage Racking Buyer's FAQ

The 15 questions tool-room managers, injection plant engineers and Tier 1 supplier procurement teams ask before issuing the first PO.

01What is the best racking system for an injection mold warehouse?
Most successful mold shops combine standard mold racks (1,000–2,000 kg moulds — typical injection), full-open heavy-duty mold racks (2,000–3,000 kg — heavy injection and die-casting), plus heavy-duty selective pallet racks (palletised mould stock and accessories). The right mix depends on mould weight distribution, change-over frequency and lifting equipment (crane vs forklift).
02How heavy a mould can a single drawer hold?
Standard mold racks: 1,000–2,000 kg per drawer. Full-open heavy-duty mold racks: 2,000–3,000 kg per drawer with reinforced bearing slides. XXL configurations: up to 8,000 kg per drawer for large-press injection, forging dies and die-casting tooling. All FEA-verified to EN 15512 / AS 4084.
03How much die-change time can mold racks save?
Customer data shows die-change cycles drop from 45 minutes to 12 minutes when switching from floor storage to full-open drawer-out mold racks — a 73% SMED improvement. The savings come from zero search time (every mould in a known slot), full mould exposure for direct crane lift, and zoned slotting near the right press.
04How much floor space can vertical mold racks recover?
Typical recovery is 60–70% of tool-room floor area previously occupied by floor-stored mould pallets. A plant storing 80 moulds on the floor (occupying ~800㎡) can compress the same inventory into ~240㎡ of vertical mold rack — freeing 560㎡ for additional production lines or pre-assembly zones.
05Can mold racks be accessed by both crane and forklift?
Yes — standard and full-open heavy-duty racks support both crane and forklift access on the same unit. Lower drawers (typically 1,000 kg or less) use forklift with pre-fitted lifting eye-bolts; upper drawers (2,000+ kg) use overhead crane. XXL configurations (3,000+ kg) are crane-only by design.
06How do you protect mould parting lines and cavities from damage in storage?
Three engineering tools: (1) PE-coated drawer surfaces prevent metal-on-metal contact damage; (2) dedicated single-mould slots eliminate mould-on-mould contact; (3) VCI paper-friendly drawer slots accommodate vapour-corrosion-inhibitor wraps for long-term protection of polished mould surfaces.
07How do you prevent mould rust during long-term storage?
Three engineering tools: (1) enclosed mezzanine zones with humidity controlled below 55% RH; (2) VCI paper-friendly drawer slots for chemical rust inhibition on stored moulds; (3) PE-coated drawer surfaces prevent water pooling on the drawer base. Critical for moulds stored more than 90 days between production runs.
08How do you trace mould inventory for IATF 16949 audits?
Three engineering tools: (1) bay-level signage with permanent mould ID labels; (2) colour-coded zoning by product family or customer; (3) optional RFID tagging integrated with MES / ERP for live mould tracking. We provide IATF-aligned design documentation and traceable rack serial numbers in every project.
09What height is achievable for mold racks?
Standard and full-open heavy-duty mold racks: 3–5 m tall (3–4 drawer levels). XXL racks: 3–5 m tall (2–3 drawer levels — fewer levels because of heavier drawer capacity and crane-clearance needs). Heavy-duty selective for palletised moulds: 4–8 m with appropriate forklift access.
10Are AME Rack mold racks compliant with IATF 16949 and ISO 9001?
Yes. All structural designs include EN 15512 / AS 4084 / RMI MH16 compliance documentation and stamped FEA reports. We use IATF-friendly design language (traceable serials, PPAP-ready documentation). Many customers use AME Rack mold racks in OEM Tier 1 audited tool rooms supporting Ford, GM, VW, Toyota and Honda programmes.
11What is the warranty on mold racking?
10-year structural warranty on all components under rated load. 15-year corrosion warranty on hot-dip galvanised parts. 5-year coating warranty on powder coat and PE-coated drawer surfaces. Drawer bearing slides covered separately — typical 5-year warranty under spec working load. Spare parts available 10+ years from invoice.
12What is the typical lead time for mold racks?
Standard mold rack: 25 days FOB Shenzhen. Full-open heavy-duty: 25–30 days (heavier gauge + HD bearing slides). XXL configuration: 30–35 days (XXL bearing slides + lateral roll-out lock fabrication). Heavy-duty selective: 20 days standard. Phased shipping available for multi-zone tool-room rollouts.
13Do you ship mold racks to North America, Europe and Asia-Pacific?
Yes — AME Rack exports to 65+ countries including major moulding hubs in USA, Mexico, Canada, Germany, Italy, UK, France, Spain, Turkey, India, Thailand, Vietnam, Indonesia and Brazil. FOB, CIF and DDP Incoterms all supported. Departure from Shenzhen Yantian / Shekou.
14What payment terms work for tool-room buyers?
30% T/T deposit + 70% balance against B/L copy standard. L/C at sight for orders ≥ USD 50,000. For multi-zone tool-room rollouts above USD 200,000: 20%/30%/50% staged payments aligned with each zone delivery. Alibaba Trade Assurance available for added buyer protection on first-time orders.
15How does AME Rack pricing compare for mold rack projects?
Direct factory pricing is typically 30–45% below European brand-name suppliers for equivalent EN 15512 spec — verifiable by RFQ benchmarking. We own the 15,500㎡ Dongguan plant outright, run 15 roll-forming lines in parallel, and procure steel via annual mill contracts. Heavy-duty bearing slides and PE-coated drawer surfaces are included in our standard build, not priced as options.

Ready to Design the Right Mold Rack Mix for Your Tool Room?

Send your mould weight distribution, change-over frequency, lifting equipment (crane / forklift) and building dimensions — receive a full 3D layout, FEA report, IATF-friendly documentation pack and FOB quotation within 4 working hours. Zero commitment.

🏭 150+ tool rooms designed📐 Free 3D + FEA design🛡️ IATF / ISO friendly

Get a free quote quickly

AME Rack quotation