Engineering Warehouse Backbones for Operators Across 65 Countries
We are AME Rack — a Dongguan-headquartered storage equipment maker that has spent two decades doing one thing well: turning raw steel coil into pallet racking, mezzanine floors and automated storage systems that keep distribution warehouses, 3PL hubs and overseas fulfilment centres running shift after shift.
A Steel-First Manufacturer Built Around Real Warehouse Problems
Most racking suppliers sell standard part numbers. AME Rack sells operational throughput. Our 15-strong engineering bench starts every project with a question — "What does a perfect pick path look like in this building?" — and then designs the rack system to deliver it, not the other way around.
From our 15,500㎡ Qiaotou plant we roll-form, robot-weld, powder-coat and pack every component in-house. There is no broker between you and the production line; every weld bead, every powder thickness reading, every load test is signed off by people on our payroll. That is the only way we know how to back a 10-year structural warranty without flinching.
Six Workshops, One Continuous Production Line
Steel coil enters at the north dock and leaves as fully packed, container-ready racking at the south dock. Take a walk through the workshops we run every working day.
01 / 06
Raw Steel Coil Yard
Q235B / Q345B · 1.5–4.0mm gauges
02 / 06
CNC Punching & Laser Cutting
±0.3mm dimensional tolerance
03 / 06
Roll-Forming Lines
15 lines in parallel operation
04 / 06
Robotic Welding Cells
10 stations · MIG/MAG
05 / 06
Powder Coating
1 manual + 2 auto lines · 60–100μm DFT
06 / 06
Final QC & Container Packing
100% inspection · ISPM-15 export
Meet the People Behind Every AME Rack Project
From the first quotation to the final container loading — eight experienced specialists work as one team to deliver your warehouse racking project on spec, on budget and on time.
SalesLily Li
Foreign Trade ManagerLeads global B2B sales across 65+ countries, fluent in English and Spanish, delivers tailored quotations within 4 working hours.
OperationsDavid Wu
Factory DirectorOversees 15,500 m² Dongguan plant and 15 roll-forming lines, ensures on-time delivery and 200,000+ pallet positions annually.
EngineeringJemin Pan
R&D DirectorStructural engineer with 18 years racking design experience, leads EN 15512 / AS 4084 / RMI MH16 compliance and FEA validation.
FinanceGrace Liu
Chief Financial OfficerManages global L/C, T/T and Sinosure-backed credit terms, supports flexible payment structures for mid- to large-scale projects.
MarketingKevin Huang
QC EngineerResponsible for comprehensive incoming material inspection, quality checks during the production process, and quality testing of finished products.
DigitalAllen Tan
Marketing DirectorDrives global brand strategy, exhibition planning (CeMAT, MODEX, LogiMAT) and digital campaigns reaching warehouse buyers worldwide.
CostingEric Zhang
Drafting EngineerProduces 3D AutoCAD / Revit layouts, FEA-ready drawings and IFC models, turning rough site sketches into stamped fabrication files.
DesignSophia Lin
Cost EngineerCalculates raw-material, coating and shipping cost per project, locks in transparent pricing and protects clients from steel volatility.
Certifications That Clear Customs and Pass Audits
Every shipment leaves our dock with the paperwork your inspector, building authority or insurer will ask for. No follow-up requests. No surcharges.
Quality Management
Audited yearly by SGS — covers design, sourcing, production and after-sales.
SGS · since 2013EU Racking Standard
Adjustable pallet racking design code, mandatory for EU/EEA market entry.
TÜV · re-tested 2024Australia / NZ Standard
Mandatory for installations in Australia, New Zealand and Pacific markets.
SAI GlobalNorth America Code
Rack Manufacturers Institute design specification accepted by US building authorities.
RMI AffiliateEuropean Federation
FEM 10.2.02/10.2.04 series for racking design, tolerances and inspection.
FEM Compliant📑 Need test reports, mill certificates or HS-code-ready commercial invoices for tendering? Our compliance desk turns around document packs within 24 hours.
Request Document PackTwo Decades of Building, Exporting, and Re-Engineering
From a 3,000㎡ workshop in Liaobu to a 15,500㎡ vertically-integrated plant supplying 65 countries — here are the inflection points along the way.
2005 · The Liaobu Beginning
AME Rack was incorporated in a 3,000㎡ workshop in Liaobu, Dongguan, supplying selective pallet racking to domestic distribution centres in southern China.
2008 · Export Department Opens
Set up our first international sales team to serve overseas distributors and warehouse operators, kicking off direct-to-buyer trade in English-speaking markets.
2010 · Past 100 Employees
Production headcount crossed 100 as demand from logistics operators in Southeast Asia and the Middle East accelerated; a second shift was added on the welding line.
2011 · Radio Shuttle & AS/RS R&D
Launched our internal R&D programme on radio shuttle racking and AS/RS automated storage — a long-term bet on dense, automated warehousing.
2013 · ISO Certified & Unilever Partnership
Earned ISO 9001 certification and shipped a turnkey drive-in racking project for Unilever, validating our heavy-duty design capability with a Fortune 100 buyer.
2015 · New 15,500㎡ Plant in Qiaotou
Relocated to a purpose-built facility in Qiaotou Town, Dongguan. Passed AS 4084 and CE certifications and signed our first overseas distributor in the Philippines.
2018 · FedEx & ExxonMobil Projects
Delivered radio shuttle racking for FedEx and ExxonMobil at their US distribution sites. Both projects passed third-party FEA review and entered repeat-order cycles.
2020 · 5 Patents Filed
Filed 5 racking-related utility and design patents. Accelerated investment in smart warehousing — WMS integration, shuttle telemetry and AGV-compatible base frames.
2022 · 50 Countries · ¥30M+ Export
Exports cleared 50 countries with annual export revenue exceeding ¥30 million; opened dedicated production lanes for distributor private-label SKUs.
2025 · 10 Global Distributors
Signed long-term distribution agreements with 10 partners across the USA, Australia, Spain, Mexico and beyond — building local stocking and quick-ship coverage.
2026 · AI & Robotics in Storage
Doubling down on R&D — bringing AI-driven slotting, vision-based QC and collaborative robots into the standard product roadmap, aiming to redefine what a racking supplier delivers.
Sample Pack Contents
What lands on your desk in 5–7 working days:
See the Quality Before You Place Your Order
For large-scale B2B projects, we offer custom physical sample packs upon request so you can inspect coating finishes, steel gauge thickness, weld craftsmanship and connector tolerances in person before finalizing your order. This optional hands-on review helps align all technical expectations prior to placing your bulk order.
- Sample parts: USD 0. You only cover DHL/FedEx express (typically USD 30–80).
- Shipping cost is 100% credited against your first PO ≥ USD 5,000.
- Custom sample requests welcomed — specify size, coating, gauge.
- Ships with mill test report, salt-spray data and engineering drawing.
- NDA available for OEM/private-label trial runs.
Free Warehouse Layout & FEA Drawing Service
Send us the building, the pallet, and the throughput target. We send back a 3D-modelled layout, an itemised BOM and a stamped load calculation — at zero cost before you commit.
2D AutoCAD Layout
Pallet positions, beam levels, aisle widths matched to your forklift fleet and fire egress code.
3D SolidWorks Render
Photo-realistic walk-through so your operations team can sign off before the steel is cut.
FEA Load Calculation
ANSYS-based finite element analysis, output to EN 15512 / AS 4084 / RMI MH16 format.
Tender-Ready BOM
Excel + PDF bill of materials with HS codes, unit weights and FOB pricing ready to drop into your RFP.
From Sketch to Stamped Drawing in 48 Hours
Send Dimensions
L×W×H, columns, doors, pallet size
Brief Call
Throughput, SKU profile, FIFO/LIFO
Layout Draft
2D + 3D within 24h
FEA Report
Structural calcs in 24h more
Quote Pack
BOM + FOB + lead time
An 8-Stage Quality Control Routine Across Every Project
A racking failure on your dock is unforgivable. Our QC team intercepts defects at eight separate checkpoints — long before a beam ever sees a container.
Inbound Steel Audit
Every coil checked against mill cert: spectrometer chemistry, yield, elongation — rejected lots returned to supplier same day.
Cut & Punch Tolerance
CNC kept inside ±0.5mm; first piece of each batch inspected on a granite reference table.
Roll-Form Profile Check
Cross-section verified every shift with laser scanner vs the engineering drawing.
Weld Integrity Test
100% visual + 10% ultrasonic. Penetration and spatter graded per AWS D1.3.
Coating DFT & Salt Spray
Powder coat 60–100μm verified by magnetic gauge; 1,000h salt-spray on production samples.
Trial Assembly
A random bay from every order is bolted up in our pre-build hall to verify fit before packing.
Load Capacity Verification
Static + dynamic load tests to 1.5× rated capacity per FEM 10.2.02.
Pre-Shipment Inspection
Final piece count, paint touch-up, packing audit — SGS / BV third-party report on request.
Container-Optimised Packing & Door-to-Door Logistics
Damage in transit shouldn't delay your project. If anything arrives broken, we confirm the count and ship replacements first — claims and insurance come after. Your installation date never waits on our paperwork.
📦 Packaging Standards
🚢 Global Logistics Options
On-Time Shipping, Backed by Production Discipline
Your project Gantt chart depends on us hitting the date in the PO. We track every order day-by-day and email weekly progress photos so you never have to chase.
On-time delivery — last 36 months, verified by export bookings.
📅 Typical 20-Day Production Window
Installation Done Right, the First Time
Three installation paths depending on project scale — from DIY-friendly bolt-up systems with video coaching, to full turn-key commissioning by our travelling crew.
Path 1 — Self-Install with Live Support
Best for distributors and end-users with their own labour. Our engineer walks your crew through it on Zoom / WhatsApp video.
- HD step-by-step assembly videos
- Bilingual installation manual (EN/ES/AR)
- Live engineer call within 30 minutes
- Free for orders above USD 5,000
Path 2 — Local Partner Crew
Vetted installation partners in 30+ countries. We coordinate, you sign one contract — saves the cost of flying our team in.
- Pre-vetted local rigger teams
- Quoted within 5 business days
- AME Rack remote supervision
- Project handover & sign-off
Path 3 — AME Rack Travelling Crew
For complex AS/RS, multi-tier mezzanine and high-bay projects above USD 50,000. Our certified installers fly to your site.
- Lead engineer + 2–4 installers
- Tooling and rigging supplied by us
- Visa + insurance handled in-house
- Sign-off certificate & warranty starts
Warranty & After-Sales Built for a 20-Year Asset
Racking is infrastructure. Treat the supplier the same way you would treat your roof installer — by what they do five years after the cheque clears.
📞 After-Sales Promise
📜 Warranty Terms
- Free replacement of any structural component failing under rated load due to manufacturing defect.
- Anti-corrosion warranty applies to hot-dip galvanised parts kept in normal warehouse / outdoor conditions.
- Coating warranty covers blistering, peeling or excessive fade outside specified colour reference.
- Engineering consultation included free of charge across the entire warranty period.
- Spare parts availability guaranteed for minimum 10 years from invoice date.
Indicative Pricing Reference (FOB Shenzhen, USD)
A directional price band per product category so you can scope budgets before issuing a formal RFQ. Binding quotation is always issued in writing within 4 working hours.
| Product Category | Reference Spec | Unit | Price Range | MOQ |
|---|---|---|---|---|
| Selective Pallet Racking | H 6m · D 1.1m · 4 levels · 1T/level | per set | $150 – $280 | 10 sets |
| Drive-In Racking | H 8m · 6 pallets deep · 1.5T/pallet | per set | $460 – $1,150 | 10 sets |
| Radio Shuttle Racking | H 10m + shuttle car | per system | $35,000 – $68,000 | 1 system |
| 4-Way Shuttle System | Multi-aisle deep storage | per project | on quote | 1 system |
| Double Deep Racking | H 7m · double-deep w/ reach truck | per set | $220 – $380 | 10 sets |
| Cantilever Racking | H 4m · 6 arms · 500kg/arm | per set | $180 – $340 | 10 sets |
| Mold Rack | Drawer-type · 2T/level | per set | $420 – $780 | 2 sets |
| Steel Mezzanine Floor | 500kg/㎡ live load, installed | per ㎡ | $42 – $95 | 60㎡ |
| Roll Container | 800×600×1650mm · zinc | per unit | $58 – $95 | 10 units |
| Wire Mesh Container | 1200×1000×890mm collapsible | per unit | $75 – $108 | 10 units |
| ASRS Mini-Load System | Turn-key per crane | per crane | $80,000 – $260,000 | 1 system |
Questions Procurement & Project Managers Ask Us
Real questions from warehouse operators, regional distributors and project consultants — answered straight, no marketing fluff.
1Can we visit or video-audit your factory before placing the first order?
2Do you provide OEM / private-label production for distributors?
3What payment terms work for first-time buyers vs repeat distributors?
4Can you provide structural calculation reports for our local building authority?
5How do you handle damage in transit or short-shipment claims?
6Are container loading plans and CBM utilisation rates available before booking?
7Do you offer distributor exclusivity for a country or region?
8What documentation do you provide for customs clearance and tendering?
9How is your pricing competitive vs other Chinese racking manufacturers?
10Can you support large multi-phase project rollouts (multiple warehouses / sites)?
Don't see your question?
Email Lily directly — typical reply window is under 4 working hours.
📧 Ask Your QuestionReady to Put AME Rack on Your Approved Vendor List?
Send us the building, the pallet and the target throughput — receive 3D layout, FEA calc and FOB quotation within 4 working hours. Zero commitment, zero deposit.